Crews Make Final Arrangements For ‘Carmageddon II’

LOS ANGELES (CBSLA.com) — Construction crews continued this weekend to make final arrangements in preparation of “Carmageddon II.”

As of 10 p.m. Friday, workers closed Mulholland Drive from the west side of the bridge to Casiano Road to allow contractors to realign, repave and restripe the roadway.

City News Service reports that the Mulholland Drive/Skirball Center Drive ramps to-and-from the 405 Freeway are expected to remain open.

Crews expected to have the roadway reopened by 6 a.m. Monday.

“Carmageddon II” is scheduled for Sept. 29-30. The 53-hour closure will allow for the demolition of the north side of the bridge.

(©2012 CBS Local Media, a division of CBS Radio Inc. All Rights Reserved. This material may not be published, broadcast, rewritten, or redistributed. Wire services contributed to this report.)

Comments

One Comment

Leave a Reply

Please log in using one of these methods to post your comment:

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

More From CBS Los Angeles

KNX 1070 Newsradio
Play.It

Listen Live